Snowy 2.0 will link two existing dams – Tantangara and Talbingo – through 27km of tunnels and build a new underground power station. It has the capability to run for more than seven days continuously before it needs to be ‘recharged’. Snowy 2.0 also has a 100-year design life.
Read More Download files